Chesapeake Energy has permitted two additional wells at Lynden Energy's Mitchell Ranch property. The S250HR horizontal sidetrack well was permitted on 12/23/11 and appears to be in the same proximity as the original S250H well. An amendment to S250H was permitted on 11/29 and looks to be a permit to shorten the original horizontal run.
The S450H horizontal sidetrack well was permitted on 12/27/11 and is indicated to be a new injection well.
Chesapeake is continuing to permit new wells at Mitchell Ranch and hopefully results will be released soon.
Tuesday, January 3, 2012
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment